After you add and connect activities, use the following steps to validate the workflow logic and save the policy:
1.Click one of the activities in your policy.
2.Click Validate to ensure that you have a valid logic flow.
If you get an error message, you must fix the problem before you can save the policy. The following changes indicate an activity that is not valid:
The border changes from magenta to black.
The label changes from black to red.
The shape changes from a rounded rectangle to a rectangle.
The tip changes to the last error that applies to the activity.
3.Click Apply to save the changes and continue working with policies.